潍坊某橡塑有限公司位于的中国蔬菜之乡——山东省寿光市,该企业产生污水主要包括工业废水和生活污水。工业废水主要来源于工艺生产中间隙排放的高浓度废液(脱脂、磷化、电泳废液等)和连续排放的脱脂溢流废水、水洗废水、磷化溢流废水及电泳废水、喷漆废水等。
处理工业污水水质
![1512791338(1).jpg](http://docs.ebdoor.com/Image/InfoContentImage/ProductDesc/2017/12/09/da/da876146-5ac8-4ec3-ad77-aa7c47586ede.jpg)
排放标准
![1512791380(1).jpg](http://docs.ebdoor.com/Image/InfoContentImage/ProductDesc/2017/12/09/5f/5f862f74-cd9c-4873-ae17-4525828046f6.jpg)
工业污水处理方案:
![1512791417(1).jpg](http://docs.ebdoor.com/Image/InfoContentImage/ProductDesc/2017/12/09/a9/a9f02561-4007-402d-8a18-06b666c12fb3.jpg)
来自生产车间的生产废水0.5m3/h,通过厂区内自流管道自流至隔油调节池,将污水中部分悬浮石油去除,在调节池内进行PH的调节。
隔油调节池的废水经过P1泵提升至斜管沉淀器,在沉淀器内通过加药絮凝作用将废水中的金属离子及悬浮物去除。经斜管沉淀器作用后,废水自流进溶气气浮机,通过气浮机的微小溶气气泡将污水中大部分悬浮油以及乳化油去除,气浮过程中为更好的去处浮油以及悬浮物需通过加药装置投加PAC、PAM,通过絮凝剂的絮凝作用,将污水中的小颗粒悬浮物絮凝成大颗粒悬浮物,更高速有效的去处水中的浮油以及悬浮物,为后续的生化部分提供条件。污水经气浮机除油后进入一体化处理装置。
一体化处理装置;一体化废水处理装置分水解酸化段、接触氧化段、和二沉池;实现废水水处理的生化全过程,二沉池设置污泥回流泵P2,实现A/O工艺的硝化液回流,保证初期的污泥量及生化处理的效果。
沉淀池出水自流进入排水,至此达标排放。
济宁天通是一家水处理设备生产和销售集一体的公司,公司拥有高的技术人才,拥有高素质的工作团队,可以及时地为客户提供完善的售后服务。我公司主要产品:水处理设备,污水处理设备、废水处理设备、工业污水设备、农业废水设备、雨水净水设备、医院污水设备、钢厂废水设备、屠宰场废水设备、食品厂废水处理设备等多种设备,可根据要求专业定制水处理设备。
Theproduction wastewater from the production workshop is 0.5m3/ h, and it flowsthrough the self-flow pipe in the factory to the oil regulating pool to removesome of the oil from the wastewater
and adjust the PH in the regulating pool.
Thewaste water from the oil regulating pool was raised to the inclined tubeprecipitator by the P1 pump, and the metal ions and suspension were removedfrom the waste water by adding drug flocculation
in the precipitator. Gravityby the inclined pipe and setting device, the waste water into the dissolved airflotation machine, through tiny dissolved air bubbles of air floatation machineremove most of the floating oil and emulsified oil in sewage, air flotationprocess
to better use oil and suspended solids by dosing PAC and PAM dosingdevice, through the flocculation flocculant, the sewage of small particlessuspended solids flocculated large particles suspended matter condensed, morehigh speed and effective place to the
oil and suspended solids in the water,biochemical section provides conditions for the follow-up. After oil removal,the sewage gas float can enter the integrated treatment device.
Integratedprocessing unit; The integrated wastewater treatment plant is divided into thehydrolytic acid segment, the contact oxidation section, and the sink pool; Torealize the biochemical
process of wastewater treatment, the sludge backflowpump P2 was set up in the sink pool to realize the flow of the nitrificationsolution of A/O process, ensuring the initial sludge volume and the effect ofbiochemical treatment.
Thewater flow of the sedimentation tank enters the drainage website.
Jiningday pass is a set of water treatment equipment production and sales of thecompany, the company has sophisticated technology talented person, has a highquality work team, can provide
customers with perfect after-sales service in atimely manner. My company main products: water treatment equipment, sewagetreatment equipment, wastewater treatment, industrial wastewater, agriculturalwastewater, rain water purification equipment, hospital sewage
equipment, steelplant waste water equipment, slaughterhouse wastewater treatment equipment,food factory waste water treatment equipment and other equipment, can professionalcustom according to the water treatment equipment.