泊头市北重机械制造有限公司 泊头市北重机械制造有限公司
诚信指数 8
一站通留言 客户留言 联系我们 联系我们 收藏此网站
首页
企业介绍
资质荣誉
供应信息
商业信息
企业新闻
招聘信息
企业名片
客户留言
产品资料
search 搜索网站中其它产品:
您现在的位置:泊头市北重机械制造有限公司 > 供应信息
 
北重铸铁地轨HT200-300

价        格:面议   
产品型号: 1500*150*150-45000*450*400MM
有 效 期: 长期有效
所 在 地: 河北省沧州市
配送信息:
供应数量:20
了解详情,请立即咨询!
 

   
      20  21  22  23  24  25  26  27  28  29  
该公司共有 29条同类“铆焊平台”信息       查看全部>>
详细说明

 

铸铁地轨用途:根据设备的固定点来设计、拼接成铸梁平台不用做成大型的平台即节省了材料成本又可以占用很小的空间性价比很高铸铁地轨主要用于大型设备的装配、试验、焊接和检验。我们可根据需方图纸制作或双方商定生产加工具体规格的地轨。

 

 

 

Cast iron ground rails application:According to the fixed point of equipment to design,    join together into ground rails, do not make a large platform,which saves the cost of materials, and can take up small space, high performance to price ratio.Cast iron ground rail is mainly used for large equipment assembly, test, welding and inspection. We can make or agreed production and processing according to buyer's drawings specifications of ground rail.

 

 

 

铸铁地轨的材质:高强度铸铁HT200-300,工作面硬度为HB170-240,经过人工回火处理,使该产品的精度稳定,耐磨性能好。

 

 Cast iron ground rail materials:High strength cast iron HT200-300 working surface        hardness is HB170-240, through artificial tempering processing, make the precision of    the product stability, and wear-resisting performance is good.

 

 

铸铁地轨铺设的技术要求

1、铸铁地轨的固定方法,在轨道的内侧两边,按要求间距(约500-700mm)M8铁膨胀钉或射钉固定牢靠。轨道底面与地面必须紧密着力,不得有虚跨间隙,以防止地轨轨道载荷后弯曲变形。

  2、地轨的的安装:使用条形桥板,合像水平仪。先调平一根地轨,然后以其为基准,依次往下进行初调。然后水泥灌浆,待水泥浆凝固后,进行精调检验。

  3、铸铁地轨的埋设深度应与地面装饰层持平或略高于3-5mm.

  4、地轨安装后,要任意1m长度内,水平偏差度不大于1mm,全长不大于2mm,轨道这间对应点的水平偏差不大于1mm,每两条轨道之间的平行度偏差小于2mm

  直线度在全长内不大于8mm

 

 

 

Cast iron ground rail laying technical requirements

 

Firstly: cast iron ground rail fixed method ,in on both sides of the inside of the orbit, spacing    (about 500-700 - mm) as required with the M8 bolts or nail fixation.Orbital floor and must closely focus on the ground,in order to prevent the ground rail track bending deformation after loading.

 

Secondly, ground rail installation:use bridge plate ,combined diagram level.Firstly trying to adjust   to rail, then as a benchmark, in order to under initial setting.Then cement grouting, after waiting for cement solidification, fine adjustment inspection.

 

Thirdly,To the buried depth of the rail shall be cast iron and the ground adornment layer flat or slightly higher than 3-5 mm.

Forthly,After the installation of ground rail,to any 1 m in length,horizontal deviation degree is not greater than 1 mm,length is not greater than 2 mm, track the level of the corresponding point deviation is not greater than 1 mm, per the parallelism between the two     track deviation is less than 2 mm.

 

推荐浏览
暂无信息

免责声明:本商铺所展示的信息由企业自行提供,内容的真实性、准确性和合法性由发布企业负责,一比多公司对此不承担任何保证责任。

友情提醒:为保障您的利益,降低您的风险,建议优先选择商机宝付费会员的产品和服务。


泊头市北重机械制造有限公司   地址:泊头市交河西开发区   
联系人:张先生   电话:0317-8250620   手机:15720241120   传真:0317-8039656
技术支持:一比多  |  免责声明 | 隐私声明
增值电信业务经营许可证:沪B2-20070060     网站Icp备案号:沪ICP备05000175号
<%---站点编号 ----%> <%---页面编号 ----%> <%---页面参数1 ----%> <%---页面参数2----%> <%---页面参数3 ----%>